Here is some public information for sizing of Oracle EBusiness Suite.
The installation
recommended the minimum of 6 GB memory for Ebusiness Suite 12.1.3 according to Oracle documention: http://docs.oracle.com/cd/B53825_08/current/acrobat/121upgrade.pdf.
For the upgrade test used in this example, a machine for the middle tier/application had 4 CPUs. The database tier
upgrade example in this document used a 24 CPU machine.
Database
Tier:
Hewlett-Packard® ProLiant® DL585 G5 server equipped with 4 x 2.7 GHz Quad-Core
AMD® Opteron™ 8384 processors.
128 GB of memory
Applications Tier:
3 x Hewlett- Packard® BL685c server blades. Each server equipped with 4 x 3.0
GHz Dual-Core AMD® Opteron® 8222 processors.
32 GB of memory
Online: 2,100 Users
Batch: 50,000 Order Lines
10,000 Payroll Employees